Multi-purpose Manager Installation Installation Guide for MPM-UN, MPM-GW and MPM-VAV MPM-UNMPM-VAVMPM-GW2 Schneider Electric | II-MPM-A4.EN.07.2016.v5 www.schneider-electric.com/buildings July 2016 MPM Installation Guide WHO SHOULD READ THIS GUIDE This guide is for integrators of SmartStruxureTM Lite solutions. It provides important information for getting you started with the set-up and configuration of your building efficiency management system. Ensure you follow the instructions to ensure a successful and trouble-free installation at the client’s site. WHO SHOULD READ THIS GUIDE Read this entire guide: The information contained in this guide helps you work effectively and minimizes the likelihood of any critical issues occurring during installation. Keep this document handy when doing your installation. Prepare your equipment before going to customer site: Commission and configure the equipment before you arrive at the customers site. Successful installation of your SmartStruxure Lite system requires proper preparation and planning. Planning in advance saves resources, prevents wasted effort, and saves time and money for you and your customer. ABOUT THIS GUIDE This guide provides instructions for the physical installation of the hardware components of your SmartStruxure Lite system. It also provides overviews of creating a network of Multi-purpose Manager (MPM) devices for the following: • MPM-UN Multi-purpose Manager • MPM-VA VAV Manager • MPM-GW Wireless Manager3 Schneider Electric | II-MPM-A4.EN.07.2016.v5 www.schneider-electric.com/buildings July 2016 Overview Multi-Purpose Management Devices are flexible lines of site and zone Managers. They allow facility Managers and Contractors to install and manage integrated solutions for HVAC, lighting, and metering. They are also a quick and efficient link between multiple devices based on many standard protocols. The Building Expert web building energy management system is embedded in the MPM Devices. The devices are also BACnet and oBIX compliant for integration into larger StruxureWare systems. MPM - UN The MPM-UN is an electronic device designed to monitor and control various end-devices for building automation applications. The Manager consists of a printed circuit board housed in a plastic shell casing. External connectors are available for the following: • 6 universal inputs • 4 analog outputs • 2 binary outputs (dry contact) • LAN (Ethernet cable) • RS-485 device (Modbus) • CANbus • Power supply The Manager is compatible with BACnet (IP/Ethernet) and oBix. The device has optional wireless modules to enable bidirectional communication with EnOcean and ZigBee devices. As well, Managers may also communicate with each other wirelessly using their ZigBee modules. USES Multi-purpose Managers are fully programmable and are designed with wireless lighting and HVAC applications in mind. They can also be used to control a wide range of wired and wireless (EnOcean and ZigBeecompatible) end-devices, including light sensors, light switches, relays, room controllers, card readers, and magnetic door contacts. They are also targeted for commercial, industrial, and institutional buildings.4 Schneider Electric | II-MPM-A4.EN.07.2016.v5 www.schneider-electric.com/buildings July 2016 MPM-UN Pinout The below figure shows the pinout information for the MPM - UN. Make sure you must remove the pink cap from the MPM before you install the pink-striped ZigBee antenna.5 Schneider Electric | II-MPM-A4.EN.07.2016.v5 www.schneider-electric.com/buildings July 2016 MPM - VA VAV The MPM-VA VAV Manager is an electronic device designed to monitor and control various end-devices for building automation purposes, including VAV boxes. It can also control various end-devices for building automation applications. The device consists of a printed circuit board housed in a plastic shell casing. External connectors are available for the following: • 6 universal inputs • 4 analog outputs • 2 binary outputs (dry contact) • 1 damper actuator • 1 pressure sensor • LAN (Ethernet cable) • RS-485 device (Modbus) • CANbus • Power supply The device has a pressure sensor and is equipped with an optional damper actuator. The device also has optional embedded EnOcean and ZigBee wireless modules to enable bidirectional communication with EnOcean and ZigBee devices. The Managers can communicate with each other wirelessly using their ZigBee modules. USES The MPM-VA VAV Managers are fully programmable and are designed with VAV control in mind. In addition to all the features of the MPM, The VAV Manager has a pressure sensor and a damper actuator for direct control of VAV boxes. VAV Managers can be used to control a wide range of wired and wireless (EnOcean and ZigBee-compatible) end-devices, including light sensors, light switches, relays, thermostats, card readers, and magnetic door contacts. The devices are targeted primarily for commercial, industrial, and institutional buildings.6 Schneider Electric | II-MPM-A4.EN.07.2016.v5 www.schneider-electric.com/buildings July 2016 MPM-VA VAV Pinout The below figure shows the pinout information for the MPM - VA VAV. Make sure you must remove the pink cap from the MPM before you install the pink-striped ZigBee antenna.7 Schneider Electric | II-MPM-A4.EN.07.2016.v5 www.schneider-electric.com/buildings July 2016 MPM - GW The MPM-GW wireless Manager is an electronic device designed to integrate wireless solutions to wired building automation systems. Small buildings system gateways can integrate wireless end-devices, based on EnOcean and ZigBee protocols and standards, into BACnet building automation systems. They are all interoperable with any BACnet compliant building management system. The MPM-GW is a printed circuit board housed in a plastic shell casing. Unlike the MPN-UN and MPM-VA, there are no physical (wired) I/Os on this manager. The following connectors are concealed in a casing, giving the device a neutral look for installation in institutional or commercial environments: • LAN • CANbus • Power supply The MPM-GWs have optional embedded EnOcean and ZigBee wireless modules to enable bidirectional communication with EnOcean and ZigBee devices. The Managers can also communicate with each other wirelessly using their ZigBee modules. USES The MPM-GW Managers are fully programmable and are designed with wireless lighting and HVAC applications in mind. They can also control wired end-devices and compatible wireless ZigBee end-devices. Wireless end-devices including light sensors, light switches, relays, thermostats, card readers, and magnetic door contacts. MPM-GWs are targeted for installation in commercial, industrial, and institutional buildings.8 Schneider Electric | II-MPM-A4.EN.07.2016.v5 www.schneider-electric.com/buildings July 2016 MPM-GW Pinout The below figure shows the pinout information for the MPM - GW. Make sure you must remove the pink cap from the MPM before you install the pink-striped ZigBee antenna. RP SMA EXTERNAL ANTENNA FOR ENOCEAN *GREY STRIPED ANTENNA FOR 868MHz *YELLOW STRIPED ANTENNA FOR 902MHz *Optional RP SMA EXTERNAL ANTENNA FOR ZIGBEE *PINK STRIPED ANTENNA FOR 2.4GHz *Optional 24 VAC AC/DC CAN H CAN L GND 24 VACAC/DC CAN H CAN L GND ETERNET 100 B/T The Supply power and Communication connectors can be found under the removable left and right panels. * x2 Supply power and Communication. The unit must be supplied with 24V AC or 24VDC. CANL and CANH are communication channel. You can use them if you want to interconnect multiple units. Link LED Power LED DETACHABLE SIDE PANEL SIDE VIEW 24 VAC AC/DC CAN H CAN L GND ETERNET 100 B/T9 Schneider Electric | II-MPM-A4.EN.07.2016.v5 www.schneider-electric.com/buildings July 2016 Installation This sections explains how to install and power up your Manager(s). Required Tools and Equipment • One flat-blade screwdriver (1/8” wide or smaller) • One straight-through Ethernet cable (RJ-45) • Computer (PC, Mac, or Linux) with the Firefox browser (version 17 or later) • Optional: Ethernet switch or hub if you want to connect your Manager to your local network. Power Up Manager The procedure shows how to add supply power to the MPM-UN, MPM-VA, and MPM-GW managers. 1. Using flat-head screwdriver, connect positive wire to 24V AC/DC pin on Manager 2. Connect second wire to GND pin on Manager. 3. Plug power supply into outlet after fastening wires. 4. Ensure the green LED on the MPM-UN/MPM-VA or the RJ-45 connector’s LED on the MPM-GW’s go on indicating the unit is powered. 24 VAC AC/DC CAN H CAN L GND 24 VACAC/DC CAN H CAN L GND ETERNET 100 B/T Solid earth ground 24 VAC LEDsNext >